
Complete with hanging rail.

And small boy helped install the boards under the tug deck that he did most of the oiling of as well. So the water tank is now ensconced on its polystyrene with some behind as well.

Now Mel can see where the water filler point is required as well as the vent. The old diesel taps etc that we thought we needed and then didn't have been capped and foamed over. Unfortunately the watertank was replaced before I knew of this to take pictures to prove to the Surveyor that we have indeed done this. Ho hum. Hopefully when the tank is removed again for Mel to do his hole drilling we can take a photo then.

No comments:
Post a Comment