
So my first two panels are cut and semi fitted. Makes a bit of difference getting in and out but still a struggle. Can't wait for the rest of the steps to be done.

these are the 'mock ups' to show levels of each step. The last one at the bottom will be on the level with the piece of wood on the engine bulkhead thingy. This goes all the way to the door into the saloon and also covers over the pipes where they cross over. There will be access to the stop tap here.
The middle one that is half on the swim and half hanging in mid air will have a box in it with hinged lid such that it doesn't interfere with the gunwale overhang. The riser of the step above will flap down for access to the things in there. Presumably the last but one step will have a removable tread to access the bilge.
the back walls of the electrical cupboards are also in but you didn't need to see those. Photographically not very interesting but very exciting for me!

This was my concrete arriving. I decided to risk light showers on the Tuesday against the heavy rain on Wednesday. I did right. We didn't get our first shower until 6pm and by that time it had completely gone off. Yeah.
I calculated the amount literally to the last teaspoon. They were collecting all the little bits that had escaped onto the garden into a Fray Bentos tin and incorporating them into the mix. And there was a small area near the door that they scooped out and found loads of pebbles so that less mix was required there and in fact we ended up with a tablespoon left over! How great is that?
This week has been quite productive. Have talked to the electrician and worked out what he can do now, what we need to do for him and what I still need to order. He starts fitting sockets etc on Monday evening provided I have done all the painting and oiling needed inside on Saturday. My poor neck and shoulder. Luckily I have booked the chiropractor for the Tuesday following to put me back on the road to recovery.
Today met my painter and discussed what she can do to the boat whilst it is still at Mel's and not undercover. She will (weather permitting) start week beginning 23rd August. Prep and undercoats only.
My deck flange and aerial fitting is booked in for Monday 17th August plus some other bits and bobs. Hopefully he will by then also fit the last of my skin fittings so that both sides of the boat will be available for my painter.
I am feeling positive again.








