Progress goes on in the bed making department.  We have sliding panels either side so can access space behind.  In the case of the starboard side obviously access to the water pipes etc.  And this afternoon Andy has started making the bed frame.



There is now a lovely panel separating off the water tank.  This will come down if we need to adjust the fittings at some time.

Looking quite civilised under there now.


And my led heated mirror is finally installed ready for the electrician to fire it up. 
As it were!


As you can see we also have Ash 'coving' and 'dado' installed so the bathroom almost looks finished.
A fest of oiling and varnishing over the weekend I think.
Perhaps I had better do evening stints as well now that the days are longer.